Zs Values and Cmin
In a TN earthing system the cornerstone of protection against electric shock is that the protective device ‘circuit breaker’ shall not exceed it’s maximum disconnection time. For a 230 v to earth TN system (covers both single phase and 3-phase) that is 0.4 seconds (final circuits less than or equal to 32A) see T41.1 and 5 seconds (distribution circuits and >32A) see … Read more