Insulation Resistance – Testing

Insulation resistance testing on a new installation(i.e. during initial verification) The object of this test is to verify that the quality of the insulation surrounding the conductors is satisfactory and has not deteriorated or been damaged causing short-circuits and earth faults. It is done at the consumer unit with all the installation switches closed ‘on’. … Read more

Testing Socket Ring Circuits

Continuity of Ring Final Circuit Conductors The objective of this dead test is to ensure that all ring circuit conductors are continuous throughout the ring, with no breaks and no interconnections and also that all connections are electrically and mechanically sound. This test also verifies the polarity of each socket outlet. The test is made … Read more

Dead Testing Electrical Installations

Introduction… Initial Verification: Dead testing must be completed after your inspection and always before any live testing takes place. This is to ensure that all safety systems such as the main earthing, main bonding and all circuit protective conductors are in place and that there is no risk of any short circuits or earth faults … Read more

Electric Vehicle Charging Modes in Amendment 1, 18th Edition BS7671

Introduced in February 2020. Amendment 1 is an amendment to Part 7 of BS7671:2018, Section 722 Electric Vehicle Charging Installations. It does not apply to electric vehicle charging points that employ inductive charging, or to mobility scooters and similar chargers for vehicles of 10 amps or less. “All electric vehicle charging installations that are commenced … Read more

Electric Vehicle Charging Installations

Section 722 BS7671:2018 Amendment 1 2020 : Electric Vehicle Charging Installations A brief overview 722.1 Scope: Section 722 does not apply to electric vehicle charging points that employ inductive charging or to mobility scooter and similar chargers for vehicles of 10 A or less. 722.311: Load curtailment, reduction or disconnection (automatically or manually) may be … Read more

Periodic Inspection and Testing

Periodic Inspection and Testing and completion of an Electrical Installation Condition Report ‘EICR’ The aim of a periodic inspection and test is to produce a report on the condition of an electrical installation and to ascertain whether it is safe for continued use. If available, previous inspection and test documents should be sought prior to … Read more

How to Pass the 18th Edition exam here at the-Regs.co.uk

We have two online 18th Edition courses for you to choose from. Our most popular is the Full 18th Edition course with exam which is the ‘Full Plus’ or ‘*Full Plus with Book’ training option. This course covers the whole of the 18th Edition BS7671 book in a tutor led cover to cover review. Our … Read more

Permitted Cable Zones / Routes

Permitted cable routes / zones BS7671:2018 I’ve recently been asked a question by one of our 18th Edition students and think it would be useful to see it here. ” My inquiry is quite simple really, but I am a little confused as to what is acceptable practice for cables that are installed in walls … Read more